Hot sale Factory Erp Upgrade Project Plan - PMS and RFID paper roll storage management – GOJON

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We aim to find out high quality disfigurement in the generation and provide the most effective services to domestic and abroad clients wholeheartedly for Conveyor Systems Ltd, Stackers White, Cross Fold Paper Folding Machine, Welcome any inquiry to our firm. We will be happy to ascertain helpful business enterprise relationships along with you!
Hot sale Factory Erp Upgrade Project Plan - PMS and RFID paper roll storage management – GOJON Detail:

Synchronization Control

7D1111

The synchronization means control single facer speed, it can keep same speed with the main canvas belt. Its role is to avoid excessive paper accumulation or pull off the bridge paper. Because speed rapid change, easy to shake machine, poor corrugated flute, poor bonding and other issues; health management will be based on characteristics of the individual motors at different speeds to provide different speed control curve, try to slow down the speed change, and get stable corrugated flute and glue (paste) uniform.

Overhead Bridge Paper Accumulation Control

7D1111

Overhead bridge control, not only to avoid the paper cutter and paper accumulation problems, and affect the accuracy of the entire wet paper change and manual tear sheet automatic compensation.The reason is simple, the entire production line, in addition to the paper wavy bridge plot is not easy to estimate, but the distance is almost fixed data from mill roller to climbing belt, as well as from the bridge suction paper guide to NC cutter. Really want to count, it is how to calculate the actual volume of paper bridge, as well as the amount of automatic detection compensation for doing bad paper torn by worker on the bridge.

For bridge detection and control, tracking and flow control technology; the one hand, track actual paper accumulation, on the other hand, use climbing belt feed amount and bridge suction guide paper output amount, to measure by flow control. The difference between the two amounts (bridge tear amount) feedback synchronization control automatically, to achieve compensation and a fixed bridge accumulation.

Auto Splicer Control

7D1111

Automatic splicing machine is not only connected to the control at the appropriate time, it also includes bridge accumulation, synchronous, slow down, before splicing paper, and paper control from paper head feed into the corrugating roll till recovery etc, series of control

Double Side Display LCD

Real-time display of the current production of several meters, the remaining number of meters;

Real-time display of the current vehicle number, the average number of vehicles;

Configuration

7D1111

Single facer control cabinet

Double facer control cabinet

Dry end control cabinet

Double side Display LCD


Product detail pictures:

Hot sale Factory Erp Upgrade Project Plan - PMS and RFID paper roll storage management – GOJON detail pictures

Hot sale Factory Erp Upgrade Project Plan - PMS and RFID paper roll storage management – GOJON detail pictures


Related Product Guide:

Our goods are commonly recognized and reliable by consumers and may satisfy continually developing economic and social needs for Hot sale Factory Erp Upgrade Project Plan - PMS and RFID paper roll storage management – GOJON , The product will supply to all over the world, such as: Bogota, Miami, Georgia, Our company offers the full range from pre-sales to after-sales service, from product development to audit the use of maintenance, based on strong technical strength, superior product performance, reasonable prices and perfect service, we'll continue to develop, to supply the high-quality goods and services, and promote lasting cooperation with our customers, common development and create a better future.
  • The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Andrew from Belize - 2017.12.31 14:53
    The company keeps to the operation concept "scientific management, high quality and efficiency primacy, customer supreme", we have always maintained business cooperation. Work with you,we feel easy!
    5 Stars By Heather from Kuala Lumpur - 2017.05.21 12:31
    Write your message here and send it to us